In partnership with

Domain Names + Web and Email Hosting Done Right

Tired of overpaying GoDaddy or Namecheap? There's a smarter option with Porkbun!

Porkbun is the domain registrar trusted by creators, developers, entrepreneurs, and anyone who wants low prices without the nonsense or the forced upsells.

Here's why so many people are making the move to the Bun:
• Most domains sold at cost
• Low, transparent registration and renewal pricing
• Free features like WHOIS privacy and SSL certificates
• Powerful web and email hosting options
• Real human support 24/7, 365 days a year
• Named the #1 domain registrar by Forbes Advisor and USA Today

Whether you're launching a business, building a personal brand, starting a side project, or creating your very first website, Porkbun makes the whole thing easy.

All solar installation work on rooftops constitutes "work at height" under the Work Health and Safety (WHS) Act and Regulations, which are enacted (with minor variations) in every Australian state and territory. Falls from roofs account for approximately 30% of fatal workplace injuries in the construction sector. The duty of care is on the Principal Contractor (the solar installation business) to implement adequate fall prevention and control measures.

The Hierarchy of Fall Control Measures

Level

Control

Example for Solar

1 — Eliminate

Remove the risk entirely

Not practical — roof work is unavoidable

2 — Substitute

Replace the hazardous work with safer work

Design the system from the ground using pole-mounted panels

3 — Engineering controls

Physical barriers

Scaffolding, edge protection, static line with anchor points

4 — Administrative controls

Work procedures

Safe Work Method Statement, trained workers only, job safety analysis

5 — PPE

Last resort

Safety harness with rope grab on static line

Mandatory Requirements for Solar Roof Work

  • A Safe Work Method Statement (SWMS) must be prepared before any roof work above 2 m height

  • At least one worker on the roof must hold a current Working at Heights training certificate (RIIWHS204E or equivalent)

  • Roof anchor points must be installed or temporary static lines deployed — workers cannot rely on ladders for positioning while working

  • A spotter must be present for any work near roof edges if edge protection is not in place

  • Ladders may be used only for access and descent — not as a work position

Engr. Jason Morales — Founder, SolarEnergyPH.

Installation and safety requirements for PV arrays (AS 5033-2014) & Guide to solar safe installation
Installation and safety requirements for PV arrays (AS 5033-2014) & Guide to solar safe installation
A two-in-one reference covering PV array installation and safety requirements per AS 5033-2014, bundled with a practical safe solar installation guide — essential reading for solar installers, elec...
$9.99 usd

Philippines Solar PV Installation Guide 2026 — Based on Australian Standards
Philippines Solar PV Installation Guide 2026 — Based on Australian Standards
A complete technical reference for solar PV system installation in the Philippines — drawn directly from AS/NZS 4509.1:2009, AS 4777.1:2005, and AS/NZS 3000:2007, cross-referenced to PEC 2017 and D...
$9.99 usd