In partnership with

Domain Names + Web and Email Hosting Done Right

Tired of overpaying GoDaddy or Namecheap? There's a smarter option with Porkbun!

Porkbun is the domain registrar trusted by creators, developers, entrepreneurs, and anyone who wants low prices without the nonsense or the forced upsells.

Here's why so many people are making the move to the Bun:
• Most domains sold at cost
• Low, transparent registration and renewal pricing
• Free features like WHOIS privacy and SSL certificates
• Powerful web and email hosting options
• Real human support 24/7, 365 days a year
• Named the #1 domain registrar by Forbes Advisor and USA Today

Whether you're launching a business, building a personal brand, starting a side project, or creating your very first website, Porkbun makes the whole thing easy.

What Is a SWMS and When Is It Required?

A Safe Work Method Statement (SWMS) is a document that identifies the steps of a high-risk construction activity, the hazards associated with each step, and the control measures to eliminate or minimise each hazard. Solar roof work constitutes "high-risk construction work" under the WHS Regulations because it involves the risk of a person falling more than 2 metres. A SWMS must be prepared before the work commences, communicated to all workers performing the work, and retained on file.

What an SWMS for Solar Must Cover

  • Task steps: Delivery of materials, access to roof, racking installation, panel lifting, electrical connection, DC testing, AC connection, commissioning

  • Hazard identification: For each step — fall from roof, electrocution from live DC, UV exposure, heat stress, manual handling injury, tool drop hazard

  • Risk controls: Edge protection or safety harness, de-energise before connecting conductors, sun protection, buddy system for panel lifting, tool tethering

  • Emergency procedures: Nearest hospital, emergency contact numbers, first aid officer on site, procedure for worker fall or electrical injury

SWMS Template vs Site-Specific SWMS

Many solar installation companies use a SWMS template that covers standard residential rooftop installations. This is acceptable for routine work on typical pitched roofs. However, the SWMS must be reviewed and modified for non-standard situations:

  • Steep or fragile (fibre cement or corrugated asbestos) roofs

  • Multi-storey buildings where fall height exceeds 4 m

  • Sites near high-voltage power lines

  • Confined spaces (battery rooms, plant rooms) requiring atmosphere testing

  • Sites with unusual wind or weather conditions

Engr. Jason Morales — Founder, SolarEnergyPH

Installation and safety requirements for PV arrays (AS 5033-2014) & Guide to solar safe installation
Installation and safety requirements for PV arrays (AS 5033-2014) & Guide to solar safe installation
A two-in-one reference covering PV array installation and safety requirements per AS 5033-2014, bundled with a practical safe solar installation guide — essential reading for solar installers, elec...
$9.99 usd

Philippines Solar PV Installation Guide 2026 — Based on Australian Standards
Philippines Solar PV Installation Guide 2026 — Based on Australian Standards
A complete technical reference for solar PV system installation in the Philippines — drawn directly from AS/NZS 4509.1:2009, AS 4777.1:2005, and AS/NZS 3000:2007, cross-referenced to PEC 2017 and D...
$9.99 usd