In partnership with

Become An AI Expert In Just 5 Minutes

If you’re a decision maker at your company, you need to be on the bleeding edge of, well, everything. But before you go signing up for seminars, conferences, lunch ‘n learns, and all that jazz, just know there’s a far better (and simpler) way: Subscribing to The Deep View.

This daily newsletter condenses everything you need to know about the latest and greatest AI developments into a 5-minute read. Squeeze it into your morning coffee break and before you know it, you’ll be an expert too.

Subscribe right here. It’s totally free, wildly informative, and trusted by 600,000+ readers at Google, Meta, Microsoft, and beyond.

AS/NZS 5033 Amd2-2018

The Problem: Panels That Stay Live

A solar PV array on a rooftop remains electrically energised as long as daylight reaches the panels — regardless of whether the inverter is off, the main switch is open, or the building is on fire. A string of 14 panels in full sun produces 550 V DC and enough current to sustain a lethal arc. This reality requires specific emergency provisions under the 2018 amendment to AS/NZS 5033.

What Rapid Shutdown Means in Practice

Rapid shutdown is the ability to reduce the DC voltage at the array to a safe level (typically ≤30 V) within a defined time period after initiating shutdown. It protects firefighters working on or near the roof from live DC conductors.

Method

How It Works

Cost

Module-level power electronics (MLPE)

Microinverters or power optimisers shut down at panel level on signal

High — adds per-panel electronics

String-level shutdown relay

Contactor in combiner box opens on signal, de-energising the string

Moderate — contactor + control wiring

Inverter-integrated shutdown

Inverter opens internal DC disconnect on grid loss or manual trigger

Low — if inverter supports it

Emergency Isolation Switch — Mandatory Requirements

Every grid-connected solar installation in Australia must have a lockable AC isolation switch that is:

  • Clearly labelled "Solar PV System Isolation Switch"

  • Located adjacent to the electricity meter or main switchboard

  • Accessible to emergency services without entering the building

  • Red in colour or with a red surround to distinguish it from general load switches

Note: Operating this switch only de-energises the AC side. The DC array cables remain live — this is the communication challenge to fire brigades. Installer must provide a site diagram showing cable routes and array location at the isolation switch.

Engr. Jason Morales — Founder, SolarEnergyPH

Keep Reading